• ROVDesign_Photo3
  • ROVDesign_Photo_11
  • ROVDesign_Photo2

Working closely with a key client SDJ was well placed to redesign the clients ROV frame and mounting arrangement. This proved to be a good opportunity to add value to the clients existing equipment. The redesign was in keeping with the clients requirement for a modular approach to their own system configurations and this design has now been incorporated into all of their new and existing equipment.

As part of the deign process the main load path was subject to DNG-GL design approval and witnessed load test.