• CableChute_Photo3
  • CableChute_Photo4
  • CableChute_Photo1
  • CableChute_Photo2

SDJ Design Engineering Ltd worked closely with Briggs Marine to design and build a cable chute to interface with their existing installation equipment.

SDJ was awarded the contract from Briggs Marine to design and build a chute that would fit on their existing vessel, increasing the chute radius to meet their client’s installation specification.
This contract has allowed SDJ to continue to build its relationship with Briggs Marine by meeting their demanding two week delivery schedule.